Change Control Plan的意思|示意
变更控制计划
Change Control Plan的网络常见释义
变更控制计划 ...line) 每周项目状态报告(Status Reports) 风险识别和缓解计划(Risk Management Plan) 变更控制计划(Change Control Plan) 项目后评审和经验教训报告(Lessons Learned) 好的项目两个过程的基本要求 项目的两个过程: 创造产品的过程和项目管理的过程 ...
Change Control Plan相关例句
This paper presents a new plan for control and measurement, the control system of which is a rate of change of pressure control system and the measurement system is a pressure measurement one.
本文提出一种新的控制测量方案,采用压力变化速率控制系统和压力测量系统。
Change control is necessary because projects seldom run exactly according to the project management plan.
由于项目很少会准确地按照项目管理计划进行,因而变更控制必不可少。
Based on analysis and discussion to normal design of frequency speed change control for cement plant, optimized design plan for general frequency speed change control has been put forward.
以水泥厂常见的变频调速控制设计为例,在对其认真分析讨论的基础上,提出了通用变频调速控制优化设计方案。
But unless you change your outdated beliefs, create a specific plan for your finances, and take action now, you will never take true control of your life.
如果你不知道改变自己的陈旧观念,制定详细的财务计划并立即行动,你就无法控制自己的命运。
C. Procurement Documentation, Contract Change Control System, Payment Schedule, Contract Management Plan.
采购文档,合同变更控制系统,支付进度表,合同管理计划。
When creating the migration plan, you need to consider general queue manager migration issues, clustering specifics, wider system architecture, and change control policies.
制定迁移计划时,需要考虑常见队列管理器迁移问题、集群细节、更广泛的系统架构和更改控制策略。