成本及进度管理
Cost And Schedule Management的网络常见释义
成本和进度管理 ... Time Schedule Management 时间进度管理 Cost And Schedule Management 成本和进度管理 bidding &schedule management 竞价及排程管理 ...
Cost And Schedule Management相关短语
1、 Project Cost and Schedule Management 项目成本和进度管理
2、 Schedule and Cost Management 进度成本管理
Cost And Schedule Management相关例句
In the construction management system, its aims mainly at the cost, schedule and quality of these three aspects.
在建设项目管理体系中,其目标主要表现在费用、进度和质量这三方面。
These problems would make the schedule of developing product late and would increase the additional cost, even may turn the management of the enterprise worse.
这些问题一方面造成产品开发速度较慢,另一方面也无形中增加了产品附加成本,有时甚至可能造成企业管理的混乱。
The results show that the project management objective system with quality, schedule, cost, safety, environmental protection and risk can manage projects scientifically and comprehensively.
结果表明:由质量、进度、成本、安全、环保、风险六大管理目标构成的目标体系是科学、全面管理工程项目的重要保证。
According to the feature of clean operating department project, discuss the project quality, schedule and cost management difficulties and the solutions.
针对净化手术室工程总承包的特点,讨论工程项目管理中质量、进度、成本方面的问题及解决方法。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
Strengthen construction management and extend use new management method can promote engineering schedule and shorten time of project and saving fund and reduce cost.
只有加强施工管理,推广使用新管理方法,才能促进工程进度,缩短工期,节约资金,降低造价。