Project Construction Units的意思|示意
项目建设单位
Project Construction Units的网络常见释义
立项建设单位 Chengde Petroleum College is the central and local build, Hebei Province People's Government, consisting mainly of a general higher vocational colleges. The school is located in the beautiful scenery and historical and cultural cities - Chengde City. Schools in 1997 was the former State Education Commission identified as the first "national exemplary common key construction of higher engineering specialist schools", in 2005 the level of higher vocational colleges assess the work of personnel training for outstanding institution in 2006 was identified as the first batch of key construction projects in Hebei Province demonstration vocational colleges in 2007 by the Ministry of Education, the Ministry of Finance identified as "national model building programs of higher vocational schools," project construction units.
Project Construction Units相关例句
The Yangtze is the China's longest river. Its Three Gorges Power Station is a gigantic project under construction; the generators the station is to use will be the largest units in the world.
长江是中国最长的河流,长江上的三峡发电厂是一项正在进行中的十分巨大的工程,该厂所要用的发电机将是世界上最大的机组。
In this paper, the construction project cost management and control in construction units was analysed simply and some Suggestions were made.
本文就建设单位在工程造价管理跟控制进行简单分析,且提出了一些建议。
This will require the construction units in the practice of constantly review and improve cost control and claims the ways and means to ensure that the project cost goals.
这就需要施工单位在实践中不断的总结和提高成本控制和索赔的方式和方法,以保证项目成本目标的实现。
The construction supervising units shall carry out construction supervision in an objective and fair manner in accordance with the entrustment by the project owners.
工程监理单位应当根据建设单位的委托,客观、正地执行监理任务。
It raises the relevant control measures aimed to effect units installation accuracy, cycle problem, etc. caused by civil design and construction during welded pipe production line project.
针对焊管生产线工程中一些由土建设计、施工带来的直接影响设备安装精度、周期等问题,提出了相应的控制措施。
Xiamen belongs to the seventh degree anti-seismic zone, construction units should set strict demands on themselves and organize construction meticulously in order to guarantee the project quality.
厦门属七度抗震区,施工单位要严格要求,精心组织施工,确保工程质量。