Project Cost Changes的意思|示意
项目成本变更
Project Cost Changes的网络常见释义
项目成本变更 项目成本会计系统:Project Cost Accounting System 项目成本变更:Project Cost Changes 项目产品清单情况说明书:Project Products List Fact Sheets ..
Project Cost Changes相关例句
The change of project refers the changes of contract caused by the modification of design document or technical specifications, which has great impact on the work of project cost management.
工程变更是指由于设计文件或技术规范修改而引起的合同变更,它对工程造价管理工作有较大的影响。
It is inevitable that engineering changes happened in the project of architecture engineering design in the cause of many reasons, and mostly causes low efficiency and high cost.
建筑工程项目在实施过程中,由于存在诸多因素,导致工程变更不可避免,并且多数情况产生效率降低和费用增加。
Provide value engineering input throughout the project and propose changes to the design and construction to reduce cost, enhance quality and shorten the project schedule;
提供整个项目的价值工程投入,提出设计和施工优化方案以降低成本,提高质量,并缩短工期;
Cost control-controlling changes to the project budget.
费用控制-控制项目预算变更。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
If your project is in development, late changes to the database schema could trigger significant code changes that jeopardize the timely delivery and quality of the deliverable, thus increasing cost.
如果您的项目处于开发阶段,今后更改数据库架构可能会导致巨大的代码更改,从而阻碍可交付结果的及时交付并降低质量,进而增加成本。