Qinshan phase的意思|示意
秦山核电站阶段
Qinshan phase的网络常见释义
秦山二期 中核网 > 首 页 > 详细信息 关键词:秦山二期;核反应堆;压力容器;无损检测 [gap=686]Key words:Qinshan Phase II;reactor;reactor pressure vessel;NDT
Qinshan phase相关短语
1、 Qinshan Phase II 隐患
2、 Qinshan Phase III 秦山三期
Qinshan phase相关例句
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
With computer technology, the in-core instrumentation system of Qinshan phase II nuclear power plant can automatically perform parameter acquisition, data process and information display.
秦山核电二期工程堆芯测量系统采用计算机技术实现了对相关数据的自动采集、数据处理和信息显示。
Structural and mechanical design are performed according to the requirement on the overall design and design input for the reactor pressure vessel support of Qinshan Phase II NPP Project.
根据总体设计要求和设计输入要求,进行了秦山核电二期工程反应堆压力容器支承的结构设计和力学设计。
The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed with this library.
依赖于专家知识建立了大亚湾核电站和秦山第二核电厂换料堆芯装载知识库,在此基础上进行换料堆芯装载方案启发式优化搜索。
In combination with the 2nd phase of Qinshan NPP, the countermeasure which should be adopted is inquired according to the developing tendency mentioned above.
结合我国秦山二期工程的具体情况,探讨了我们应该采取的对策。