Stochastic Programming Model的意思|示意

美 / / 英 / /

随机规划模型


Stochastic Programming Model的网络常见释义

随机规划模型 ...性;随机规划模型;蒙特卡洛最优方法 [gap=577]Keywords: Surgery Scheduling, The Uncertainty, Stochastic Programming Model, Monte Carlo Optimization Method.

Stochastic Programming Model相关短语

1、 Stochastic dynamic programming model 随机性动态规划

Stochastic Programming Model相关例句

A stochastic programming model with fuzzy chance constraint is presented which has stochastic and fuzzy parameters.

提出一类模糊机会约束的随机期望值规划模型,该模型同时含有随机和模糊参数。

The parameters of model are measured by taking into account the stochastic characteristic of entire test data, which is connected with a maximum likelihood method and math programming.

考虑整套试验数据的随机特性,利用极大似然法原理和数学规划法求解模型参数。

Following, it describes in detail of the dynamic stochastic programming model used in asset liability management, consisting of the basic concepts, optimizing model and the steps.

第三,集中重点描述了随机动态规划在资产负债管理中的应用,包括基本概念、完整的优化模型及应用的步骤等。

A stochastic linear programming model with simple recourse was developed to study the asset and liability management of Banks under uncertainties based on the domestic economic environment.

使用带有简单补偿的随机线性规划模型,研究不确定下的银行资产负债管理问题。

Transform the bilevel stochastic programming model into single-level stochastic programming model under certain confidence, and a corresponding mixed method is designed.

在一定的置信度下,将双层规划模型转化为单层随机规划模型,并设计了相应的混合智能算法。

A chance constrained programming model is built to the stochastic optimal power flow problem (S-OPF) considering load probabilistic distributions.

针对考虑负荷概率分布的随机最优潮流问题,建立了相应的机会约束规划模型。