critical path的意思|示意

美 / ˈkritikəl pɑ:θ / 英 / ˈkrɪtɪkəl pæθ /

n. 关键途径


critical path相关例句

The article provides the algorithmic thought and the realization of intact algorithm of critical path.

本文给出了求关键路径的算法思想及完整的算法实现.

期刊摘选

What is the critical path of a program?

一个项目的关键途径是指什么?

期刊摘选

C . The project has a schedule slippage that includes changes to the critical path.

项目有一项进度滑移,它包括对关键路径的变更.

期刊摘选

The critical path method was originally developed to solve scheduling problems in an industrial setting.

关键路线方法最初的发展是为了解决一项工业安装的安排问题.

辞典例句

First , critical path tracing algorithm ( CRIPT ) is analyzed and then is modified and changed into pseudo CRIPT algorithm.

在分析了临界路径跟踪法优缺点的基础上,对其进行改进,提出了伪临界路径跟踪法.

期刊摘选

He should also be able to identify which tasks are on the critical path.

他还应能识别哪项任务位于关键路径上.

期刊摘选