critical path network的意思|示意
关键路径网络
critical path network的网络常见释义
关键路径网络图 CPN Critical Path Network 关键路径网络图 CPPC Cost Plus Percentage of Cost Contract 成本加成本百分比合同 CPR Cost Performance Ratio 成本绩效比率 ..
critical path network相关短语
1、 CPN Critical Path Network 关键路径网络图
2、 C Critical Path Network 关键路径网络图
3、 CPN N Critical Path Network 关键路径网络图
critical path network相关例句
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
The primary goal of the DTN program is to develop and field network services that deliver critical information reliably even when no end-to-end path exists through the network.
DTN计划的主要目标是开发和部署一项能够具备可靠传输关键信息特性的网络,甚至是在网络中没有端-端路径的情况下。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。