high dam construction的意思|示意

美 / / 英 / /

高坝施工


high dam construction的网络常见释义

高坝建设 ... aswan high dam 阿斯旺水坝 high dam construction 高坝建设 Aswan High Dam is completed 历史上今天埃及阿斯旺水坝竣工 ...

high dam construction相关短语

1、 high-dam construction process 高坝施工全过程

2、 high arch dam construction 高拱坝施工

high dam construction相关例句

Jinghong hydropower station RCC dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult.

景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。

Hydraulic fill dam is a fast and economic method for dam building, but the construction of filling is confined by seasons owing to long freezing period of cold zone at high latitude.

水坠筑坝是我国创造的一种快速、经济筑坝方法,但高寒地区冰冻期长,冲填施工受到季节限制。

Simulation of hydraulic fracturing of rock mass is an important issue in the construction design of high dam and deep-lying tunnel and so on.

岩体水力劈裂模拟是高坝、深埋隧洞等工程施工设计中的重要问题。

After 11 years of construction, the Aswan High Dam in Egypt is completed.

历经11年的修建后,埃及的阿斯旺水坝竣工完成。

To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.

理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。

Middle the former hydroelectric station construction, the gravity dam mostly chooses on new and the complete rock mass, the rock mass quality is high.

以往的水电站建设当中,重力坝大都选择在新鲜和完整程度好的岩体上,岩体质量较高。