overall construction time的意思|示意

美 / ˈəuvərɔ:l kənˈstrʌkʃən taim / 英 / ˈovɚˌrɔl kənˈstrʌkʃən taɪm /

全部施工时间


overall construction time相关例句

'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.

现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。

We should work according to the overall schedule chart (the construction time schedule) of the project.

我们应该根据工程项目标总进度表(构筑进度表)工作。

Thus the construction time of the refrigerated store can be much shortened, which help to reduce the installation time of overall equipment.

目的是尽可能缩短冷库的建造周期,为整船设备安装周期的缩短创造有利条件;