performance management cycle的意思|示意
绩效管理周期
performance management cycle的网络常见释义
表现管理周期 performance management 工作表现管理;表现管理 performance management cycle 表现管理周期 Performance Management Guide 《工作表现管理指南》 ..
performance management cycle相关短语
1、 The Performance Management Cycle 绩效管理周期
performance management cycle相关例句
Performance evaluation is a key point in the lifecycle of project management. It is the end of the last cycle and the start of the next one.
绩效评价处于项目管理生命周期中承上启下的关键环节,既是对上一次循环的总结,又是下一个循环的开始。
Performance planning stage are the entire performance management cycle beginning as well as the staff will achieve the job performance of the process of mutual communication.
绩效计划阶段是整个绩效管理循环的开始,也是对员工将实现的工作绩效进行相互沟通的过程。
The Performance Management Cycle.
绩效管理周期。
Shipbuilding capability management can increase capability utilization, reduce the shipbuilding cycle, improve the management of production planning and production performance efficiency.
船舶制造能力管理能提高资源能力利用率,缩短造船周期,提高船厂生产计划和生产实绩管理的效率。
Combined with the idea of whole-life cycle management for engineering project, the internal process of the performance evaluation of railway construction project management has been established.
结合工程项目全寿命周期管理思想,构建铁路建设工程项目管理绩效评价的内部流程。
LCAM (life cycle asset management) is an important strategy for power grid companies, which aims to balance the operational performance and investments (both Capex and Opex).
资产全寿命周期管理是电网企业的重要战略、它要求实现运营表现和成本投入的综合最优。