project cost audit的意思|示意

美 / / 英 / /

工程造价审计


project cost audit的网络常见释义

工程造价审计 刍议工程造价审计的问题 - xzbu.com 中国论文网 关键词:工程造价审计; 审计风险; 问题根源; 应对措施 [gap=472]Key words: project cost audit; audit risk; causes; countermeasures

project cost audit相关短语

1、 project cost audit in advance 事前审计

project cost audit相关例句

This article annotates the general contents about the audit of the project cost, also emphatically analyzes the refutable measures against the confirmation and counterclaim of a project.

文章诠释了工程结算审核的一般内容,分析了对签证和索赔的反驳。

Based on the analysis of the problems arising from the project cost audit work, reasonable Suggestions to improve the level of project cost audit work are put forward.

本文在对目前工程造价审计工作中出现的问题进行分析的基础上,对提高工程造价审计工作水平提出合理化建议。

Audit after the event is the key link of follow-up audit, including the acceptance test of completion of a project and the examining and approving of the cost of house repairing engineering.

房屋修缮工程审计是高校内部审计的重要内容之一,而跟踪审计又是高校房屋修缮工程审计的基本方法。

Engineering Follow-up auditing, as a new method, has received good results in the project control, but also greatly increases the audit cost.

工程跟踪审计这一新生的方法在工程项目控制中收到了很好的效果,但是也大大的增加了审计成本。

This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.

本文介绍了与工程造价相关的工程计量签证、工程变更及竣工结算审核几个环节的相关管理。

In the management of government audit project, audit time and audit cost and audit quality are dialectic unification.

国家审计项目管理中,审计时间、审计成本与审计质量是辩证统一的。