project time limit and cost的意思|示意

美 / / 英 / /

项目工期及成本


project time limit and cost的网络常见释义

工期 工期-成本

project time limit and cost相关例句

In order to increase the level of project construction, this paper proposed the strategy of intensifying the time limit control and cost control.

深化项目法施工,加强工期控制和进度控制,实现企业效益的最大化。

Advanced construction methods are propitious to improve quality and security of construction, shorten the time limit for a project, lower the cost of construction.

先进的施工方法有利于提高结构的施工质量和安全性,并可有效的缩短工期和降低施工成本。

The paper detailed discusses the cause, meaning, controlling program, the dealing principle of time limit for a project and cost of change in the work, and discussing construction scheme optimum.

本文就工程变更的原因、意义、控制程序、变更工期和价格的处理原则、施工方案的优化进行了较为详尽的论述。

The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.

探讨了工程成本与时间曲线为非线性时,成本与工期的优化问题。

A stochastic network model is built by use of the theory and method of Monte Carlo Simulation, with a view to analyzing the risk of the time limit for project and its cost.

建立一个工期和费用估计的随机网络模型,说明应用蒙特卡洛模拟进行工期和费用风险分析的原理及方法。

The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.

随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。