resource-time optimization problem的意思|示意

美 / / 英 / /

资源-时间优化问题


resource-time optimization problem的网络常见释义

资源 资源-时间优化问题

resource-time optimization problem相关例句

The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.

随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。

Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.

车间调度的优化问题,作为制造企业的核心,是一类具有时间约束、次序约束以及资源约束的组合优化问题。

At the same time, a corresponding particle swarm optimization algorithm is presented to solve the optimization problem of integer resource allocation. This algorithm is easy to programming.

同时,针对整数资源分配这类组合优化问题,提出了相应的离散粒子群算法。